To finish all pending flushes between tests. This stops the unit
tests from hanging on node 11 when run in certain combinations.
Requires https://github.com/matrix-org/matrix-mock-request/pull/6
(so will need a release of matrix-mock-request before merging)
Add lots of calls to `syncPromise` to cope with the fact that sync responses
are now handled asynchronously, which makes them prone to races otherwise.
Also a quick sanity-check in crypto to make one of the test failures less
cryptic.
Automated replacement of utils.failTest with nodeify
This was done with the perl incantation:
```
find spec -name '*.js' |
xargs perl -i -pe 's/catch\((testUtils|utils).failTest\).done\(done\)/nodeify(done)/'
```
more auto
There is a common pattern in the tests which is, when we want to mock a /sync,
to flush it, and then, in the next tick of the promise loop, to wait for the
syncing event. However, this is racy: there is no guarantee that the syncing
event will not happen before the next tick of the promise loop.
Instead, we should set the expectation of the syncing event, then do the flush.
(Technically we only need to wait for the syncing event, but by waiting for
both we'll catch any errors thrown by the flush, and make sure we don't have
any outstanding flushes before proceeding).
Add a utility method to TestClient to do the above, and use it where we have a
TestClient.
(Also fixes a couple of other minor buglets in the tests).
startClient was written in such a way that it would leave a flush() running,
which could sometimes interfere with the rest of the test (or even subsequent
tests), causing sporadic test failures. Make sure that the flush completes
before we move on.
Fix a test which turned out to be relying on that behaviour (there was a flush
which ended up being a no-op, thus effectively inserting a pause allowing the
sync promise to complete.
Fix a beforeEach handler which was relying on startClient resolving to
undefined.
Much of this transformation has been done automatically:
* add expect import to each file
* replace `not.to` with `toNot`
* replace `to[Not]Be{Undefined,Null}` with equivalents
* replace `jasmine.createSpy(...)` with `except.createSpy`, and `andCallFake`
with `andCall`
Also:
* replace `jasmine.createSpyObj` with manual alternatives
* replace `jasmine.Clock` with `lolex`
Remove some we don't care about. Set some other ones we do care
about but don't currently adhere to to warn. Set the max warnings
threshold to the current number of warnings, so we don't introduce
more of them. Fix a bunch of legit lint errors and add exceptions
to various places in the test code that does funny things with
'this'.
When we got a redaction event, we were adding the entire (circular) MatrixEvent
object for the redaction to the redacted event, which would then cause
exceptions down the line (particularly when dealing with gappy timelines).
We should only be adding the raw event.
Fixes (hopefully) https://github.com/vector-im/vector-web/issues/1389.
This provides optional support for fetching old events via the /context API,
and paginating backwards and forwards from them, eventually merging into the
live timeline.
To support it, events are now stored in an EventTimeline, rather than directly
in an array in the Room; the old names are maintained as references for
compatibility.
The feature has to be enabled explicitly, otherwise it would be impossible for
existing clients to back-paginate to the old events after a gappy /sync.
Still TODO here:
* An object which provides a window into the timelines to make them possible to
use. This will be a separate PR.
* Rewrite the 'EventContext' used by the searchRoomEvents API in terms of an
EventTimeline - it is essentially a subset.